Name | /PARTIAL-BIGINT-LIN/PB06/web/uclid_pb_benchmarks/ normalized-cache-ibm-q-unbounded.Ic22arity.ucl--soft-33-100-0.wbo |
MD5SUM | 9139ed650d8e3a05453e5f33c40a0f97 |
Bench Category | PARTIAL-BIGINT-LIN (both soft and hard constraints, big integers, linear constraints) |
Best result obtained on this benchmark | MSAT |
Best cost obtained on this benchmark | 5 |
Best CPU time to get the best result obtained on this benchmark | 1800.36 |
Max-Satisfiable | |
Max-(Un)Satisfiability was proved | |
Best value of the cost | |
Optimality of the best cost was proved | |
Number of variables | 87751 |
Total number of constraints | 254772 |
Number of soft constraints | 171160 |
Number of constraints which are clauses | 247060 |
Number of constraints which are cardinality constraints (but not clauses) | 0 |
Number of constraints which are nor clauses,nor cardinality constraints | 7712 |
Minimum length of a constraint | 1 |
Maximum length of a constraint | 15 |
Top cost | 8641599 |
Min constraint cost | 1 |
Max constraint cost | 100 |
Sum of constraints costs | 8641598 |
Biggest number in a constraint | 130 |
Number of bits of the biggest number in a constraint | 8 |
Biggest sum of numbers in a constraint | 512 |
Number of bits of the biggest sum of numbers | 10 |
Number of products (including duplicates) | 0 |
Sum of products size (including duplicates) | 0 |
Number of different products | 0 |
Sum of products size | 0 |
Solver Name | TraceID | Answer | CPU time | Wall clock time |
---|---|---|---|---|
PB/CT 0.1 fixed (complete) | 2698795 | MSAT (TO) | 1800.14 | 1800.09 |
SAT4J PB CuttingPlanes 2.2.0 2010-05-26 (complete) | 2691611 | MSAT (TO) | 1800.29 | 1778.89 |
SAT4J PB RES // CP 2.2.0 2010-05-31 (complete) | 2694272 | MSAT (TO) | 1800.29 | 1742.73 |
SAT4J PB Resolution 2.2.1 (complete) | 2698054 | MSAT (TO) | 1800.36 | 1791.75 |
SAT4J PB Resolution 2.2.0 2010-05-26 (complete) | 2690870 | MSAT (TO) | 1800.39 | 1782.32 |
PB/CT 0.1 (complete) | 2695013 | Signal | 1.60076 | 1.60142 |
This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).
cost of falsified constraints: 10388--too large--