MAX-CSP 2008 Competition: solvers results per benchmarks

Result page for benchmark
maxcsp/randomMaxCSP/completeLoose/
normalized-vcsp-25-10-100-18-1_ext.xml

Jump to solvers results

General information on the benchmark

Namemaxcsp/randomMaxCSP/completeLoose/
normalized-vcsp-25-10-100-18-1_ext.xml
MD5SUM6f6903b46e724f9d5fe0067a36a46002
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkMOPT
Best Number of falsified constraints2
Best CPU time to get the best result obtained on this benchmark141.108
Satisfiable
(Un)Satisfiability was proved
Number of variables25
Number of constraints300
Maximum constraint arity2
Maximum domain size10
Number of constraints which are defined in extension300
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerNumber of falsified constraintsCPU timeWall clock time
toulbar2/BTD 2008-06-271117645OPTIMUM2 98.0791 98.5733
toulbar2 2008-06-271117646OPTIMUM2 141.108 142.204
Sugar v1.13+minisat1117644OPTIMUM2 209.247 211.63
Sugar++ v1.13+minisat-inc1117643OPTIMUM2 454.246 458.773
AbsconMax 112 pc-w1117641MSAT (TO)2 1574.7 4000.03
AbsconMax 112 pc-d1117642MSAT (TO)2 1586.14 4000.07
Concrete + CSP4J - MCRW Engine 2008-05-301117639MSAT (TO)2 3600.06 3601.82
Concrete + CSP4J - Tabu Engine 2008-05-301117640MSAT (TO)2 3600.08 3615.52

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Number of falsified constraints: 2
Solution found:
3 1 3 4 1 0 1 9 2 3 2 9 3 7 3 6 2 8 2 9 2 9 1 0 6