MAX-CSP 2008 Competition: solvers results per benchmarks

Result page for benchmark
csp/langford4/
normalized-langford-4-4.xml

Jump to solvers results

General information on the benchmark

Namecsp/langford4/
normalized-langford-4-4.xml
MD5SUMb37d50180c85d43bb3d8c25e0f871b0d
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkMOPT
Best Number of falsified constraints2
Best CPU time to get the best result obtained on this benchmark1.68774
Satisfiable
(Un)Satisfiability was proved
Number of variables16
Number of constraints132
Maximum constraint arity2
Maximum domain size16
Number of constraints which are defined in extension0
Number of constraints which are defined in intension132
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerNumber of falsified constraintsCPU timeWall clock time
Sugar++ v1.13+minisat-inc1113837OPTIMUM2 1.68774 1.99673
Sugar v1.13+minisat1113838OPTIMUM2 1.84272 2.10053
AbsconMax 112 pc-w1113835OPTIMUM2 104.942 214.522
AbsconMax 112 pc-d1113836OPTIMUM2 1123.77 2769.57
Concrete + CSP4J - MCRW Engine 2008-05-301113833MSAT (TO)2 3600.07 3607.02
Concrete + CSP4J - Tabu Engine 2008-05-301113834MSAT (TO)2 3600.09 3628.52

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Number of falsified constraints: 2
Solution found:
5 1 2 3 7 4 6 8 9 12 10 13 11 15 14 0