MAX-CSP 2008 Competition: solvers results per benchmarks

Result page for benchmark
csp/rand-10-20-10/
normalized-rand-10-20-10-5-10000-15_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/rand-10-20-10/
normalized-rand-10-20-10-5-10000-15_ext.xml
MD5SUMe2f300e40241c0b4c747cb27e32e09ee
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkMOPT
Best Number of falsified constraints2
Best CPU time to get the best result obtained on this benchmark1421.45
Satisfiable
(Un)Satisfiability was proved
Number of variables20
Number of constraints5
Maximum constraint arity10
Maximum domain size10
Number of constraints which are defined in extension5
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerNumber of falsified constraintsCPU timeWall clock time
Sugar v1.13+minisat1109734OPTIMUM2 1421.45 1435
Sugar++ v1.13+minisat-inc1109733OPTIMUM2 1498.24 1506.34
Concrete + CSP4J - MCRW Engine 2008-05-301109729MSAT (TO)3 3600.07 3601.42
AbsconMax 112 pc-d1109732MSAT (TO)3 3600.11 3601.34
AbsconMax 112 pc-w1109731MSAT (TO)3 3600.11 3632.54
Concrete + CSP4J - Tabu Engine 2008-05-301109730MSAT (TO)4 3600.02 3608.42
toulbar2/BTD 2008-06-271109735? (TO)3 3600.04 3604.01
toulbar2 2008-06-271109736? (TO) 3600.07 3602.11

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Number of falsified constraints: 2
Solution found:
7 8 1 1 9 5 7 9 1 5 3 9 5 9 8 1 5 4 2 9