MAX-CSP 2006 Competition: solvers results per benchmarks

Result page for benchmark
coloring/
geom-40-2-ext.xml

Jump to solvers results

General information on the benchmark

Namecoloring/
geom-40-2-ext.xml
MD5SUM4b03e5504b43f1baf966786915db3fbb
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkMOPT
Best Number of satisfied constraints56
Best CPU time to get the best result obtained on this benchmark1.44678
SatisfiableNO
(Un)Satisfiability was proved
Number of variables40
Number of constraints78
Maximum constraint arity2
Maximum domain size2
Number of constraints which are defined in extension78
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Toolbar_MaxSat 2007-01-19283045OPTIMUM 0.38694 0.398049
Toulbar2 2007-01-12283044OPTIMUM 1.44678 1.46368
toolbar 2007-01-12283047OPTIMUM 1.50477 1.5264
Toolbar_BTD 2007-01-12283046OPTIMUM 1.55676 1.57432
AbsconMax 109 EPFC283042OPTIMUM 99.7158 100.244
AbsconMax 109 PFC283043OPTIMUM 186.178 186.406
CSP4J - MaxCSP 2006-12-19283041MSAT (TO) 2400.12 2401.66
aolibpvo 2007-01-17283039Signal 0.045992 0.0474961
aolibdvo 2007-01-17283040Signal 0.090985 0.0926339