CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
taillard/os-taillard-10/
os-taillard-10-100-9.xml

Jump to solvers results

General information on the benchmark

Nametaillard/os-taillard-10/
os-taillard-10-100-9.xml
MD5SUM9a2ef65edf8fd30850593c0a23951dfa
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.219965
SatisfiableYES
(Un)Satisfiability was provedYES
Number of variables100
Number of constraints900
Maximum constraint arity2
Maximum domain size604
Number of constraints which are defined in extension0
Number of constraints which are defined in intension900
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Tramontane 2006-12-04235413SAT 0.219965 0.228537
Mistral 2006-12-04235412SAT 0.532918 0.546948
sugar 0.40235414SAT 3.39 3.58784
buggy_2_5 2007-01-08235411SAT 12.836 13.2462
CSP4J - Combo 2006-12-19235404SAT 96.4983 96.8038
Abscon 109 ESAC235402SAT 103.377 104.382
buggy_2_5_s 2007-01-08235410SAT 499.558 502.364
CSP4J - MAC 2007-01-16272301SAT 525.876 526.414
Abscon 109 AC235403SAT 551.94 555.714
SAT4JCSP-CACHED 1.7 RC BF3235408? 310.688 296.83
sat4jCSP 1.7 RC BF3235409? 395.309 396.778
galacJ beta 1235401? (problem) 261.178 262.632
galac 1235406? (problem) 266.947 267.801
VALCSP 3.0235407? (MO) 111.831 112.771
VALCSP 3.1269509? (MO) 113.003 113.479
CSP4J - MAC 2006-12-19235405? (TO) 1800.05 1810.12
BPrologCSPSolver70a 2006-12-13235400? (TO) 1800.06 1807.95
CSPtoSAT+minisat 0.3235415? (TO) 1800.12 1816.81