CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
taillard/
os-taillard-10/os-taillard-10-95-7.xml

Jump to solvers results

General information on the benchmark

Nametaillard/
os-taillard-10/os-taillard-10-95-7.xml
MD5SUM1ac4899202187205cc402a22c67930db
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark23.26
SatisfiableNO
(Un)Satisfiability was proved
Number of variables100
Number of constraints900
Maximum constraint arity2
Maximum domain size565
Number of constraints which are defined in extension0
Number of constraints which are defined in intension900
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
sugar 0.40235336UNSAT 23.26 23.4627
SAT4JCSP-CACHED 1.7 RC BF3235330? 374.468 375.889
sat4jCSP 1.7 RC BF3235331? 411.696 412.83
galac 1235328? (problem) 362.301 365.922
galacJ beta 1235317? (problem) 370.286 370.591
VALCSP 3.0235329? (MO) 107.814 108.242
VALCSP 3.1269505? (MO) 110.108 110.137
CSP4J - Combo 2006-12-19235326? (TO) 1800 1804.42
buggy_2_5 2007-01-08235333? (TO) 1800.03 1808.41
buggy_2_5_s 2007-01-08235332? (TO) 1800.03 1807.13
CSP4J - MAC 2006-12-19235327? (TO) 1800.04 1806.59
Mistral 2006-12-04235334? (TO) 1800.04 1802.78
CSP4J - MAC 2007-01-16272297? (TO) 1800.07 1817.95
BPrologCSPSolver70a 2006-12-13235315? (TO) 1800.08 1807.07
CSPtoSAT+minisat 0.3235337? (TO) 1800.08 1801.9
Tramontane 2006-12-04235335? (TO) 1800.12 1806.8
Abscon 109 ESAC235324? (TO) 1800.13 1806.79
Abscon 109 AC235325? (TO) 1800.17 1806.85