CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
taillard/os-taillard-10/
os-taillard-10-105-5.xml

Jump to solvers results

General information on the benchmark

Nametaillard/os-taillard-10/
os-taillard-10-105-5.xml
MD5SUM7b8cab6ec70ebd45de2b8c6678d6df2b
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.215966
SatisfiableYES
(Un)Satisfiability was provedYES
Number of variables100
Number of constraints900
Maximum constraint arity2
Maximum domain size565
Number of constraints which are defined in extension0
Number of constraints which are defined in intension900
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Tramontane 2006-12-04235296SAT 0.215966 0.223419
Mistral 2006-12-04235295SAT 0.286956 0.300372
buggy_2_5 2007-01-08235294SAT 2.05069 2.0716
sugar 0.40235297SAT 2.95255 3.1552
Abscon 109 AC235286SAT 15.7236 15.8122
Abscon 109 ESAC235285SAT 62.3105 62.4041
CSP4J - MAC 2007-01-16272295SAT 129.47 130.167
CSP4J - MAC 2006-12-19235288SAT 158.564 159.99
CSP4J - Combo 2006-12-19235287SAT 165.641 166.574
buggy_2_5_s 2007-01-08235293SAT 488.96 492.465
BPrologCSPSolver70a 2006-12-13235283SAT 1349.94 1350.3
SAT4JCSP-CACHED 1.7 RC BF3235291? 291.895 291.122
sat4jCSP 1.7 RC BF3235292? 396.088 398.072
galacJ beta 1235284? (problem) 310.459 312.039
galac 1235289? (problem) 314.436 316.029
VALCSP 3.1269503? (MO) 115.396 115.43
VALCSP 3.0235290? (MO) 117.67 117.709
CSPtoSAT+minisat 0.3235298? (TO) 1800.06 1816.78