CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
taillard/os-taillard-15/
os-taillard-15-100-3.xml

Jump to solvers results

General information on the benchmark

Nametaillard/os-taillard-15/
os-taillard-15-100-3.xml
MD5SUM0951552dc3a9f6a35af8698628e348b6
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.792878
SatisfiableYES
(Un)Satisfiability was provedYES
Number of variables225
Number of constraints3150
Maximum constraint arity2
Maximum domain size946
Number of constraints which are defined in extension0
Number of constraints which are defined in intension3150
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Tramontane 2006-12-04233485SAT 0.792878 0.801942
sugar 0.40233486SAT 14.7548 15.5113
buggy_2_5 2007-01-08233483SAT 23.5164 23.7575
Abscon 109 AC233475SAT 82.8884 83.7125
Abscon 109 ESAC233474SAT 449.604 453.61
buggy_2_5_s 2007-01-08233482SAT 512.006 516.038
CSP4J - MAC 2006-12-19233477? 22.7585 23.0358
CSP4J - MAC 2007-01-16272198? 24.0423 24.1752
CSP4J - Combo 2006-12-19233476? 28.5757 28.9189
sat4jCSP 1.7 RC BF3233481? 267.98 268.894
SAT4JCSP-CACHED 1.7 RC BF3233480? 309.533 310.246
galac 1233478? (problem) 224.021 225.171
galacJ beta 1233473? (problem) 227.878 229.269
VALCSP 3.1269406? (MO) 160.96 162.435
VALCSP 3.0233479? (MO) 168.23 168.662
Mistral 2006-12-04233484? (TO) 1800.06 1809.09
BPrologCSPSolver70a 2006-12-13233472? (TO) 1800.11 1803.32
CSPtoSAT+minisat 0.3233487? (TO) 1800.12 1815.77