CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
pseudoSeries/aim/
aim-200-6-0-1.xml

Jump to solvers results

General information on the benchmark

NamepseudoSeries/aim/
aim-200-6-0-1.xml
MD5SUM5a6857f2776e616f6cac310de94b0e76
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.286955
SatisfiableYES
(Un)Satisfiability was provedYES
Number of variables400
Number of constraints1400
Maximum constraint arity3
Maximum domain size2
Number of constraints which are defined in extension0
Number of constraints which are defined in intension1400
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Tramontane 2006-12-04213099SAT 0.286955 0.28925
Mistral 2006-12-04213098SAT 0.535917 0.546826
CSPtoSAT+minisat 0.3213101SAT 0.543916 0.54697
sugar 0.40213100SAT 1.11 1.52383
Abscon 109 AC213092SAT 1.85372 1.9113
galacJ beta 1213090SAT 2.73958 2.81078
Abscon 109 ESAC213091SAT 2.75558 2.87283
galac 1213095SAT 2.76958 2.85213
SAT4JCSP-CACHED 1.7 RC BF3213096SAT 4.11737 4.18639
sat4jCSP 1.7 RC BF3213097SAT 4.5963 4.69453
CSP4J - Combo 2006-12-19213093SAT 4.64829 4.65653
CSP4J - MAC 2007-01-16271063SAT 7.45887 7.56524
CSP4J - MAC 2006-12-19213094SAT 8.15876 8.21029
BPrologCSPSolver70a 2006-12-13213089SAT 699.684 705.726