CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
pseudoSeries/uclid/
25s-smv.xml

Jump to solvers results

General information on the benchmark

NamepseudoSeries/uclid/
25s-smv.xml
MD5SUMf7a273ee733be68f959a2f3726847276
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark9.68753
SatisfiableNO
(Un)Satisfiability was provedNO
Number of variables5072
Number of constraints12828
Maximum constraint arity15
Maximum domain size2
Number of constraints which are defined in extension0
Number of constraints which are defined in intension12828
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
CSPtoSAT+minisat 0.3210707UNSAT 9.68753 9.78375
Tramontane 2006-12-04210705UNSAT 40.6798 40.89
galac 1210701UNSAT 168.819 169.732
galacJ beta 1210690UNSAT 303.456 304.295
Mistral 2006-12-04210704UNSAT 401.361 401.917
CSP4J - MAC 2006-12-19210700UNSAT 1776.66 1793.35
SAT4JCSP-CACHED 1.7 RC BF3210702? (MO) 9.60054 9.58169
sugar 0.40210706? (MO) 48.05 49.7077
sat4jCSP 1.7 RC BF3210703? (MO) 462.997 463.865
CSP4J - Combo 2006-12-19210699? (TO) 1800.07 1800.54
CSP4J - MAC 2007-01-16270881? (TO) 1800.1 1808.87
BPrologCSPSolver70a 2006-12-13210688? (TO) 1800.12 1800.56
Abscon 109 ESAC210697? (TO) 1800.14 1817.41
Abscon 109 AC210698? (TO) 1800.14 1802.21