CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
jobShop/jobShop-enddr1/
enddr1-10-by-5-7.xml

Jump to solvers results

General information on the benchmark

NamejobShop/jobShop-enddr1/
enddr1-10-by-5-7.xml
MD5SUM9b2a6147dca650c7a3e325c9b76e27d1
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.035993
SatisfiableYES
(Un)Satisfiability was provedYES
Number of variables50
Number of constraints265
Maximum constraint arity2
Maximum domain size127
Number of constraints which are defined in extension0
Number of constraints which are defined in intension265
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 2006-12-04198246SAT 0.035993 0.039024
BPrologCSPSolver70a 2006-12-13198234SAT 0.035993 0.0372469
Tramontane 2006-12-04198247SAT 0.036994 0.0399311
buggy_2_5 2007-01-08198245SAT 0.344947 0.366552
VALCSP 3.1268102SAT 0.733887 0.740179
VALCSP 3.0198241SAT 0.77688 0.781857
sugar 0.40198248SAT 1.02 1.22539
Abscon 109 ESAC198236SAT 1.71674 1.74809
Abscon 109 AC198237SAT 1.77173 1.79572
CSP4J - MAC 2007-01-16270129SAT 3.20951 3.29118
CSP4J - MAC 2006-12-19198239SAT 3.32249 3.35571
buggy_2_5_s 2007-01-08198244SAT 5.30919 5.3362
CSP4J - Combo 2006-12-19198238SAT 5.58715 5.65654
sat4jCSP 1.7 RC BF3198243SAT 13.249 13.066
SAT4JCSP-CACHED 1.7 RC BF3198242SAT 16.1905 16.3288
galacJ beta 1198235SAT 27.0319 27.2357
galac 1198240SAT 46.11 46.2852
CSPtoSAT+minisat 0.3198249? (TO) 1800.04 1806.68