CSP 2006 Competition (second round): solvers results per benchmarks

Result page for benchmark
primes/primes-25/
primes-25-80-2-3.xml

Jump to solvers results

General information on the benchmark

Nameprimes/primes-25/
primes-25-80-2-3.xml
MD5SUM9b04e86ac42860503a7a50456fc13146
Bench CategoryN-ARY-INT (n-ary constraints in intension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.024995
SatisfiableYES
(Un)Satisfiability was proved
Number of variables100
Number of constraints80
Maximum constraint arity5
Maximum domain size96
Number of constraints which are defined in extension0
Number of constraints which are defined in intension80
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
BPrologCSPSolver70a 2006-12-13248646SAT 0.024995 0.026291
Abscon 109 AC248649SAT 4.02539 4.12999
Abscon 109 ESAC248648SAT 4.90425 5.03395
CSPtoSAT+minisat 0.3248658SAT 1375.79 1381.1
SAT4JCSP-CACHED 1.7 RC BF3248653? (MO) 43.2834 43.073
sat4jCSP 1.7 RC BF3248654? (MO) 58.985 56.7
CSP4J - Combo 2006-12-19248650? (TO) 0.007998 1808.86
CSP4J - MAC 2006-12-19248651? (TO) 1800.06 1807.29
galacJ beta 1248647? (TO) 1800.08 1816.85
galac 1248652? (TO) 1800.09 1816.91
sugar 0.40248657? (TO) 1804.13 2103.85
Tramontane 2006-12-04248656Signal 0.029995 0.035015
Mistral 2006-12-04248655Signal 0.033994 0.084724
CSP4J - MAC 2007-01-16273015Wrong Cert. 1321.09 1332.47