Name | /PARTIAL-BIGINT-LIN/PB10/oliveras/j90/ normalized-j9015_10-unsat--soft-33-100-0.wbo |
MD5SUM | 3402b4987c79c2ab9cecc3296840b6e6 |
Bench Category | PARTIAL-BIGINT-LIN (both soft and hard constraints, big integers, linear constraints) |
Best result obtained on this benchmark | MOPT |
Best cost obtained on this benchmark | 33 |
Best CPU time to get the best result obtained on this benchmark | 2.89756 |
Max-Satisfiable | |
Max-(Un)Satisfiability was proved | |
Best value of the cost | |
Optimality of the best cost was proved | |
Number of variables | 14196 |
Total number of constraints | 44553 |
Number of soft constraints | 29847 |
Number of constraints which are clauses | 44245 |
Number of constraints which are cardinality constraints (but not clauses) | 0 |
Number of constraints which are nor clauses,nor cardinality constraints | 308 |
Minimum length of a constraint | 1 |
Maximum length of a constraint | 90 |
Top cost | 1501276 |
Min constraint cost | 1 |
Max constraint cost | 100 |
Sum of constraints costs | 1501275 |
Biggest number in a constraint | 66 |
Number of bits of the biggest number in a constraint | 7 |
Biggest sum of numbers in a constraint | 565 |
Number of bits of the biggest sum of numbers | 10 |
Number of products (including duplicates) | 0 |
Sum of products size (including duplicates) | 0 |
Number of different products | 0 |
Sum of products size | 0 |
Solver Name | TraceID | Answer | CPU time | Wall clock time |
---|---|---|---|---|
Sat4j Resolution 2011-06-08 (complete) | 3492112 | OPTIMUM | 2.89756 | 1.66966 |
This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).
cost of falsified constraints: 33--too large--