CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/tightness0.8/
normalized-rand-2-40-80-103-800-99_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/tightness0.8/
normalized-rand-2-40-80-103-800-99_ext.xml
MD5SUM12a26fd39c5063e54ad5459b71a5f5ae
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.78488
Satisfiable
(Un)Satisfiability was proved
Number of variables40
Number of constraints103
Maximum constraint arity2
Maximum domain size80
Number of constraints which are defined in extension103
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2092270UNSAT 0.78488 0.791111
Concrete 2009-07-14 (complete)2092264UNSAT 3.65244 3.72581
Choco2.1.1b 2009-07-16 (complete)2117624UNSAT 5.22821 5.26198
Choco2.1.1 2009-06-10 (complete)2092266UNSAT 6.76697 6.8641
Abscon 112v4 AC (complete)2099425UNSAT 7.43387 7.55874
Abscon 112v4 ESAC (complete)2099426UNSAT 8.27274 8.3789
Concrete DC 2009-07-14 (complete)2092265UNSAT 16.6745 16.8414
SAT4J CSP 2.1.1 (complete)2092261UNSAT 19.1121 19.328
bpsolver 09 (complete)2092271UNSAT 20.1029 20.2818
Sugar v1.14.6+picosat (complete)2092267UNSAT 44.2323 44.6894
Sugar v1.14.6+minisat (complete)2092268UNSAT 47.1968 47.7521
pcs-restart 0.3.2 (complete)2092263UNSAT 115.405 116.431
pcs 0.3.2 (complete)2092262UNSAT 138.719 140.011
Conquer 2009-07-10 (complete)2092269? (TO) 1800.08 1803.22

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: