CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/tightness0.8/
normalized-rand-2-40-80-103-800-50_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/tightness0.8/
normalized-rand-2-40-80-103-800-50_ext.xml
MD5SUMb06820ea90a1073b7ce483e7ea9f0643
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.12498
Satisfiable
(Un)Satisfiability was proved
Number of variables40
Number of constraints103
Maximum constraint arity2
Maximum domain size80
Number of constraints which are defined in extension103
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2092116SAT 0.12498 0.126693
Abscon 112v4 ESAC (complete)2099398SAT 0.985849 1.04246
Abscon 112v4 AC (complete)2099397SAT 1.00285 1.0353
Concrete 2009-07-14 (complete)2092110SAT 1.85172 1.88208
Choco2.1.1b 2009-07-16 (complete)2117610SAT 2.94655 3.00117
Choco2.1.1 2009-06-10 (complete)2092112SAT 3.54846 3.63203
bpsolver 09 (complete)2092117SAT 4.09338 4.13064
Concrete DC 2009-07-14 (complete)2092111SAT 9.36058 9.49488
SAT4J CSP 2.1.1 (complete)2092107SAT 10.7374 10.8917
pcs 0.3.2 (complete)2092108SAT 15.3207 15.3324
pcs-restart 0.3.2 (complete)2092109SAT 16.5055 16.5933
Sugar v1.14.6+picosat (complete)2092113SAT 25.3281 25.4451
Sugar v1.14.6+minisat (complete)2092114SAT 52.556 53.1775
Conquer 2009-07-10 (complete)2092115? (TO) 1800.12 1802.82

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
65 12 32 70 24 45 30 4 61 10 57 18 75 46 2 57 51 54 9 41 66 36 63 56 64 56 69 47 38 53 38 54 0 29 68 46 67 67 1 52