CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/rand-2-30-15-fcd/
normalized-rand-2-30-15-306-230-fcd-1_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/rand-2-30-15-fcd/
normalized-rand-2-30-15-306-230-fcd-1_ext.xml
MD5SUMfb962e9cebb6dc6265bb92f0d9b96b34
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.280957
Satisfiable
(Un)Satisfiability was proved
Number of variables30
Number of constraints225
Maximum constraint arity2
Maximum domain size15
Number of constraints which are defined in extension225
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2090400SAT 0.280957 0.280436
pcs-restart 0.3.2 (complete)2090393SAT 0.402938 0.405648
bpsolver 09 (complete)2090401SAT 1.27181 1.28375
Conquer 2009-07-10 (complete)2090399SAT 1.54077 1.84022
Abscon 112v4 AC (complete)2099085SAT 1.83672 1.87564
pcs 0.3.2 (complete)2090392SAT 1.88271 1.88983
Abscon 112v4 ESAC (complete)2099086SAT 1.9907 2.04507
Choco2.1.1b 2009-07-16 (complete)2117454SAT 2.18167 2.25146
Sugar v1.14.6+minisat (complete)2090398SAT 2.6446 2.82339
Sugar v1.14.6+picosat (complete)2090397SAT 2.75358 2.84928
Concrete 2009-07-14 (complete)2090394SAT 2.79757 2.8644
SAT4J CSP 2.1.1 (complete)2090391SAT 3.2745 3.31625
Concrete DC 2009-07-14 (complete)2090395SAT 3.53446 3.58396
Choco2.1.1 2009-06-10 (complete)2090396SAT 3.70744 3.78305

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
0 9 10 3 14 4 14 1 13 13 4 13 7 3 12 4 2 12 6 14 11 2 10 14 14 14 13 8 12 2