CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/composed-25-10-20/
normalized-composed-25-10-20-5_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/composed-25-10-20/
normalized-composed-25-10-20-5_ext.xml
MD5SUM80cc978ba841a78be9434244930a6f7e
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.044993
Satisfiable
(Un)Satisfiability was proved
Number of variables105
Number of constraints620
Maximum constraint arity2
Maximum domain size10
Number of constraints which are defined in extension620
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2090279SAT 0.044993 0.0477089
pcs 0.3.2 (complete)2090271SAT 0.099984 0.101183
pcs-restart 0.3.2 (complete)2090272SAT 0.111982 0.119631
Choco2.1.1 2009-06-10 (complete)2090275SAT 0.957854 1.08916
bpsolver 09 (complete)2090280SAT 0.961852 0.97511
Abscon 112v4 AC (complete)2099063SAT 0.996848 1.04316
Choco2.1.1b 2009-07-16 (complete)2117443SAT 1.03784 1.04839
Abscon 112v4 ESAC (complete)2099064SAT 1.21381 1.25287
Sugar v1.14.6+minisat (complete)2090277SAT 1.24081 1.37883
Sugar v1.14.6+picosat (complete)2090276SAT 1.28181 1.38007
Concrete 2009-07-14 (complete)2090273SAT 1.39379 1.47146
Conquer 2009-07-10 (complete)2090278SAT 1.92271 2.12847
SAT4J CSP 2.1.1 (complete)2090270SAT 2.82957 2.50093
Concrete DC 2009-07-14 (complete)2090274SAT 3.2795 3.30185

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
6 5 1 6 8 0 0 3 9 0 8 1 7 5 9 9 8 8 7 3 9 2 0 2 5 1 4 4 3 6 9 7 7 2 9 2 8 8 9 8 8 9 0 0 5 0 6 2 4 2 8 5 2 0 8 4 8 0 1 0 6 5 2 5 6 2 0 5 6 3
6 9 7 7 0 7 3 0 1 7 9 3 2 2 7 5 2 2 0 8 2 3 4 2 9 2 0 4 8 0 9 8 8 4 4