CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/tightness0.35/
normalized-rand-2-40-16-250-350-70_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/tightness0.35/
normalized-rand-2-40-16-250-350-70_ext.xml
MD5SUMab20183b0bfcee2d88d91440208a4225
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark2.47962
Satisfiable
(Un)Satisfiability was proved
Number of variables40
Number of constraints250
Maximum constraint arity2
Maximum domain size16
Number of constraints which are defined in extension250
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2089454SAT 2.47962 2.4825
Choco2.1.1 2009-06-10 (complete)2089450SAT 3.01954 3.06533
Conquer 2009-07-10 (complete)2089453SAT 3.67044 3.88491
bpsolver 09 (complete)2089455SAT 3.99339 4.03254
Choco2.1.1b 2009-07-16 (complete)2117368SAT 6.78397 6.86041
Concrete 2009-07-14 (complete)2089448SAT 7.69183 7.81315
Abscon 112v4 ESAC (complete)2098914SAT 12.4371 12.5081
Abscon 112v4 AC (complete)2098913SAT 13.3 13.4325
Concrete DC 2009-07-14 (complete)2089449SAT 16.8974 17.0072
Sugar v1.14.6+picosat (complete)2089451SAT 29.0536 29.2709
Sugar v1.14.6+minisat (complete)2089452SAT 57.7902 58.4194
pcs-restart 0.3.2 (complete)2089447SAT 82.6254 83.4088
pcs 0.3.2 (complete)2089446SAT 87.2947 88.1208
SAT4J CSP 2.1.1 (complete)2089445SAT 220.856 222.23

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
3 13 4 14 7 1 14 5 8 15 14 2 5 15 6 3 9 11 11 0 9 6 10 6 10 2 15 13 9 10 12 5 5 15 5 10 9 6 8 4