CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/composed-25-1-25/
normalized-composed-25-1-25-7_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/composed-25-1-25/
normalized-composed-25-1-25-7_ext.xml
MD5SUM348d18fb9ba50b0fa63c75fcff591535
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.019996
Satisfiable
(Un)Satisfiability was proved
Number of variables33
Number of constraints247
Maximum constraint arity2
Maximum domain size10
Number of constraints which are defined in extension247
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2089058UNSAT 0.019996 0.022699
pcs-restart 0.3.2 (complete)2089051UNSAT 0.039993 0.0455429
pcs 0.3.2 (complete)2089050UNSAT 0.039993 0.0459059
bpsolver 09 (complete)2089059UNSAT 0.188971 0.197217
Conquer 2009-07-10 (complete)2089057UNSAT 0.661899 0.849209
Choco2.1.1b 2009-07-16 (complete)2117332UNSAT 0.703892 0.735336
Choco2.1.1 2009-06-10 (complete)2089054UNSAT 0.771881 0.789851
Abscon 112v4 AC (complete)2098841UNSAT 0.830873 0.836608
Abscon 112v4 ESAC (complete)2098842UNSAT 0.882865 0.900651
Sugar v1.14.6+minisat (complete)2089056UNSAT 0.944855 1.03745
Sugar v1.14.6+picosat (complete)2089055UNSAT 1.09783 1.21063
Concrete 2009-07-14 (complete)2089052UNSAT 1.12683 1.17323
Concrete DC 2009-07-14 (complete)2089053UNSAT 1.21681 1.23927
SAT4J CSP 2.1.1 (complete)2089049UNSAT 1.49877 1.55743

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: