CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/geom/
normalized-geo50-20-d4-75-59_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/geom/
normalized-geo50-20-d4-75-59_ext.xml
MD5SUMed39f2c6b9e4b5357ea5e6ecdc653cb8
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.05599
Satisfiable
(Un)Satisfiability was proved
Number of variables50
Number of constraints386
Maximum constraint arity2
Maximum domain size20
Number of constraints which are defined in extension386
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2088805SAT 0.05599 0.0591781
pcs-restart 0.3.2 (complete)2088798SAT 0.130979 0.137751
pcs 0.3.2 (complete)2088797SAT 0.142977 0.148196
Conquer 2009-07-10 (complete)2088804SAT 0.904861 1.09188
Abscon 112v4 AC (complete)2098795SAT 0.962853 0.992209
Abscon 112v4 ESAC (complete)2098796SAT 1.06284 1.10092
Choco2.1.1b 2009-07-16 (complete)2117309SAT 1.15382 1.17076
Choco2.1.1 2009-06-10 (complete)2088801SAT 1.15782 1.23067
bpsolver 09 (complete)2088806SAT 1.24381 1.24733
Concrete 2009-07-14 (complete)2088799SAT 1.3328 1.37133
Concrete DC 2009-07-14 (complete)2088800SAT 1.59076 1.67013
Sugar v1.14.6+picosat (complete)2088802SAT 1.83172 1.97362
Sugar v1.14.6+minisat (complete)2088803SAT 1.87571 2.02269
SAT4J CSP 2.1.1 (complete)2088796SAT 2.36164 2.40446

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
15 16 9 16 12 5 13 11 19 13 10 8 20 4 12 19 11 16 11 7 17 18 15 2 1 15 18 16 8 3 18 2 1 17 1 1 14 5 4 1 1 5 1 11 13 20 19 8 3 17