CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/geom/
normalized-geo50-20-d4-75-84_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/geom/
normalized-geo50-20-d4-75-84_ext.xml
MD5SUM8bf874fa15f5fe571ee1afa9e66836c3
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.052991
Satisfiable
(Un)Satisfiability was proved
Number of variables50
Number of constraints367
Maximum constraint arity2
Maximum domain size20
Number of constraints which are defined in extension367
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2088783SAT 0.052991 0.059565
pcs 0.3.2 (complete)2088775SAT 0.129979 0.140972
pcs-restart 0.3.2 (complete)2088776SAT 0.137978 0.144897
Conquer 2009-07-10 (complete)2088782SAT 0.891864 1.07962
Abscon 112v4 ESAC (complete)2098792SAT 0.927858 0.940351
Choco2.1.1 2009-06-10 (complete)2088779SAT 0.971852 0.999585
Choco2.1.1b 2009-07-16 (complete)2117307SAT 0.97985 0.997551
Abscon 112v4 AC (complete)2098791SAT 0.993848 1.05789
bpsolver 09 (complete)2088784SAT 1.25581 1.27602
Concrete 2009-07-14 (complete)2088777SAT 1.3278 1.39657
Sugar v1.14.6+minisat (complete)2088781SAT 1.53977 1.643
Concrete DC 2009-07-14 (complete)2088778SAT 1.54976 1.60995
Sugar v1.14.6+picosat (complete)2088780SAT 1.9507 2.06596
SAT4J CSP 2.1.1 (complete)2088774SAT 2.39164 2.451

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
10 1 18 8 18 17 13 14 1 16 1 1 17 3 1 9 19 17 18 10 4 10 8 14 19 6 14 7 1 19 11 1 12 5 2 2 4 8 20 1 1 19 17 2 2 7 17 20 1 11