CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/geom/
normalized-geo50-20-d4-75-94_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/geom/
normalized-geo50-20-d4-75-94_ext.xml
MD5SUMedcea5f07ea32046e9d2a4753997c78c
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark27.4408
Satisfiable
(Un)Satisfiability was proved
Number of variables50
Number of constraints496
Maximum constraint arity2
Maximum domain size20
Number of constraints which are defined in extension496
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2088761UNSAT 27.4408 27.6831
Conquer 2009-07-10 (complete)2088760UNSAT 99.1779 100.321
Concrete DC 2009-07-14 (complete)2088756UNSAT 106.318 106.418
Abscon 112v4 ESAC (complete)2098788UNSAT 109.161 109.738
Abscon 112v4 AC (complete)2098787UNSAT 110.361 111.326
Concrete 2009-07-14 (complete)2088755UNSAT 115.024 116.061
Choco2.1.1b 2009-07-16 (complete)2117305UNSAT 119.051 120.348
Choco2.1.1 2009-06-10 (complete)2088757UNSAT 162.648 162.773
pcs 0.3.2 (complete)2088753? (TO) 1800.05 1801.93
Sugar v1.14.6+picosat (complete)2088758? (TO) 1800.07 1804.12
pcs-restart 0.3.2 (complete)2088754? (TO) 1800.09 1808.82
bpsolver 09 (complete)2088762? (TO) 1800.1 1802.02
Sugar v1.14.6+minisat (complete)2088759? (TO) 1800.13 1804.03
SAT4J CSP 2.1.1 (complete)2088752? (TO) 1800.63 1813.89

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: