CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/geom/
normalized-geo50-20-d4-75-78_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/geom/
normalized-geo50-20-d4-75-78_ext.xml
MD5SUM15824a983d001581c4af9fa721dbed63
Bench Category2-ARY-EXT (binary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark0.05799
Satisfiable
(Un)Satisfiability was proved
Number of variables50
Number of constraints388
Maximum constraint arity2
Maximum domain size20
Number of constraints which are defined in extension388
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2088739SAT 0.05799 0.060174
pcs-restart 0.3.2 (complete)2088732SAT 0.121981 0.124712
pcs 0.3.2 (complete)2088731SAT 0.130979 0.134485
Abscon 112v4 ESAC (complete)2098784SAT 0.919859 0.944743
Conquer 2009-07-10 (complete)2088738SAT 0.938857 1.16678
Abscon 112v4 AC (complete)2098783SAT 0.952855 0.992029
Choco2.1.1 2009-06-10 (complete)2088735SAT 1.00185 1.05137
Choco2.1.1b 2009-07-16 (complete)2117303SAT 1.21381 1.28123
bpsolver 09 (complete)2088740SAT 1.3178 1.33736
Concrete 2009-07-14 (complete)2088733SAT 1.3428 1.37785
Concrete DC 2009-07-14 (complete)2088734SAT 1.48477 1.56135
Sugar v1.14.6+minisat (complete)2088737SAT 1.63275 1.74987
Sugar v1.14.6+picosat (complete)2088736SAT 2.02069 2.14462
SAT4J CSP 2.1.1 (complete)2088730SAT 2.65759 2.7228

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
1 7 11 5 10 11 4 17 14 3 16 6 13 20 15 3 20 12 12 1 14 7 15 20 8 15 8 16 7 8 9 6 6 17 14 16 12 17 18 4 17 1 6 11 6 11 14 17 3 3