CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/dag-rand/
normalized-rand-n23-d3-e16-r15-t150000-16.xml

Jump to solvers results

General information on the benchmark

Namecsp/dag-rand/
normalized-rand-n23-d3-e16-r15-t150000-16.xml
MD5SUM2fafccada6e61bab7ddd8c0eaa42fb68
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark156.255
Satisfiable
(Un)Satisfiability was proved
Number of variables23
Number of constraints16
Maximum constraint arity15
Maximum domain size3
Number of constraints which are defined in extension16
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Abscon 112v4 ESAC (complete)2098640UNSAT 156.255 157.173
Abscon 112v4 AC (complete)2098639UNSAT 174.014 175.223
Concrete 2009-07-14 (complete)2087941UNSAT 627.191 632.495
Concrete DC 2009-07-14 (complete)2087942UNSAT 788.073 790.37
pcs 0.3.2 (complete)2087939UNSAT 1054.71 1058.65
SAT4J CSP 2.1.1 (complete)2087938? 113.603 113.278
Sugar v1.14.6+minisat (complete)2087945? 159.013 160.748
Sugar v1.14.6+picosat (complete)2087944? 167.999 169.445
bpsolver 09 (complete)2087948? (problem) 314.251 314.653
Conquer 2009-07-10 (complete)2087946? (MO) 135.78 137.527
Mistral 1.545 (complete)2087947? (TO) 1800.11 1810.56
pcs-restart 0.3.2 (complete)2087940? (TO) 1800.15 1807.14
Choco2.1.1b 2009-07-16 (complete)2117231? (TO) 1800.17 1802.46
Choco2.1.1 2009-06-10 (complete)2087943? (TO) 1800.21 1801.15

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: