CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/os-taillard-10/
normalized-os-taillard-10-95-7.xml

Jump to solvers results

General information on the benchmark

Namecsp/os-taillard-10/
normalized-os-taillard-10-95-7.xml
MD5SUM11551bc76d5c9f11de296b7ca14c09e0
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.239963
Satisfiable
(Un)Satisfiability was proved
Number of variables100
Number of constraints900
Maximum constraint arity2
Maximum domain size565
Number of constraints which are defined in extension0
Number of constraints which are defined in intension900
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
bpsolver 09 (complete)2087596UNSAT 0.239963 0.247652
Choco2.1.1 2009-06-10 (complete)2087591UNSAT 1.35379 1.38027
Choco2.1.1b 2009-07-16 (complete)2117199UNSAT 1.38579 1.44715
Sugar v1.14.6+minisat (complete)2087593UNSAT 26.316 26.652
Sugar v1.14.6+picosat (complete)2087592UNSAT 46.189 46.7781
Mistral 1.545 (complete)2087595UNSAT 66.1459 66.6567
SAT4J CSP 2.1.1 (complete)2087586? 362.758 364.394
pcs-restart 0.3.2 (complete)2087588? (MO) 779.856 783.737
pcs 0.3.2 (complete)2087587? (MO) 872.865 876.749
Concrete 2009-07-14 (complete)2087589? (TO) 1800.01 1811.72
Concrete DC 2009-07-14 (complete)2087590? (TO) 1800.01 1803.52
Abscon 112v4 ESAC (complete)2098576? (TO) 1800.11 1807.45
Abscon 112v4 AC (complete)2098575? (TO) 1800.18 1802.86

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: