CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/dag-half/
normalized-half-n25-d5-e56-r7-3.xml

Jump to solvers results

General information on the benchmark

Namecsp/dag-half/
normalized-half-n25-d5-e56-r7-3.xml
MD5SUMa120acb0d25d871e6ddc3f8ad8bfd6be
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark184.611
Satisfiable
(Un)Satisfiability was proved
Number of variables25
Number of constraints56
Maximum constraint arity7
Maximum domain size5
Number of constraints which are defined in extension56
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2087144SAT 184.611 185.736
pcs-restart 0.3.2 (complete)2087137SAT 1334.4 1335.13
Concrete DC 2009-07-14 (complete)2087139SAT 1419.07 1420.86
Concrete 2009-07-14 (complete)2087138SAT 1521.25 1533.84
bpsolver 09 (complete)2087145? (problem) 172.375 174.142
Sugar v1.14.6+picosat (complete)2087141? (MO) 13.9618 14.988
Sugar v1.14.6+minisat (complete)2087142? (MO) 14.62 14.8677
Conquer 2009-07-10 (complete)2087143? (TO) 1800.02 1805.92
pcs 0.3.2 (complete)2087136? (TO) 1800.07 1811.23
Abscon 112v4 ESAC (complete)2098494? (TO) 1800.13 1816.66
Choco2.1.1b 2009-07-16 (complete)2117158? (TO) 1800.16 1814.61
Choco2.1.1 2009-06-10 (complete)2087140? (TO) 1800.17 1800.91
Abscon 112v4 AC (complete)2098493? (TO) 1800.19 1802.09
SAT4J CSP 2.1.1 (complete)2087135? (TO) 1800.43 1806.73

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
3 1 1 1 3 0 0 0 3 4 1 1 0 2 0 0 2 0 3 0 1 4 3 1 2