CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/dag-half/
normalized-half-n25-d5-e56-r7-8.xml

Jump to solvers results

General information on the benchmark

Namecsp/dag-half/
normalized-half-n25-d5-e56-r7-8.xml
MD5SUMbebfdc7ba7b4c6d509a2fbfd415a09b0
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark158.178
Satisfiable
(Un)Satisfiability was proved
Number of variables25
Number of constraints56
Maximum constraint arity7
Maximum domain size5
Number of constraints which are defined in extension56
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2087111SAT 158.178 159.554
Choco2.1.1 2009-06-10 (complete)2087107SAT 629.481 632.54
Conquer 2009-07-10 (complete)2087110SAT 1207.63 1211.78
bpsolver 09 (complete)2087112? (problem) 171.341 172.824
Sugar v1.14.6+picosat (complete)2087108? (MO) 14.6318 15.003
Sugar v1.14.6+minisat (complete)2087109? (MO) 15.6 15.9047
pcs 0.3.2 (complete)2087103? (TO) 1800.06 1814.73
pcs-restart 0.3.2 (complete)2087104? (TO) 1800.07 1812.03
Concrete 2009-07-14 (complete)2087105? (TO) 1800.08 1800.92
Concrete DC 2009-07-14 (complete)2087106? (TO) 1800.08 1802.52
Abscon 112v4 AC (complete)2098487? (TO) 1800.09 1809.96
Abscon 112v4 ESAC (complete)2098488? (TO) 1800.17 1817.4
Choco2.1.1b 2009-07-16 (complete)2117155? (TO) 1800.19 1814.12
SAT4J CSP 2.1.1 (complete)2087102? (TO) 1800.36 1811.18

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
0 0 4 3 0 3 4 0 1 4 2 0 3 1 1 0 4 2 3 0 2 2 1 4 4