CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/dag-half/
normalized-half-n25-d5-e56-r7-16.xml

Jump to solvers results

General information on the benchmark

Namecsp/dag-half/
normalized-half-n25-d5-e56-r7-16.xml
MD5SUMb7e9524b8eaa9cb78435f60b3e354238
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark151.099
Satisfiable
(Un)Satisfiability was proved
Number of variables25
Number of constraints56
Maximum constraint arity7
Maximum domain size5
Number of constraints which are defined in extension56
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2087100SAT 151.099 151.936
Abscon 112v4 AC (complete)2098485SAT 1055.73 1061.08
Choco2.1.1 2009-06-10 (complete)2087096SAT 1087.69 1090.34
Abscon 112v4 ESAC (complete)2098486SAT 1545.98 1557.37
bpsolver 09 (complete)2087101? (problem) 166.795 168.073
Sugar v1.14.6+minisat (complete)2087098? (MO) 14.71 15.0769
Sugar v1.14.6+picosat (complete)2087097? (MO) 14.9657 15.5313
Concrete DC 2009-07-14 (complete)2087095? (TO) 1800 1816.82
Concrete 2009-07-14 (complete)2087094? (TO) 1800.05 1809.12
pcs-restart 0.3.2 (complete)2087093? (TO) 1800.06 1809.53
pcs 0.3.2 (complete)2087092? (TO) 1800.08 1801.03
Conquer 2009-07-10 (complete)2087099? (TO) 1800.09 1808.12
Choco2.1.1b 2009-07-16 (complete)2117154? (TO) 1800.11 1807.39
SAT4J CSP 2.1.1 (complete)2087091? (TO) 1800.45 1810.47

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
3 4 4 2 3 1 4 2 0 4 1 1 3 4 0 2 4 4 3 4 2 0 4 2 2