CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/dag-half/
normalized-half-n25-d5-e56-r7-12.xml

Jump to solvers results

General information on the benchmark

Namecsp/dag-half/
normalized-half-n25-d5-e56-r7-12.xml
MD5SUMccf341648ea4c9765316041a04d071c1
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark199.893
Satisfiable
(Un)Satisfiability was proved
Number of variables25
Number of constraints56
Maximum constraint arity7
Maximum domain size5
Number of constraints which are defined in extension56
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2087089SAT 199.893 200.007
bpsolver 09 (complete)2087090? (problem) 169.449 170.829
Sugar v1.14.6+picosat (complete)2087086? (MO) 13.43 13.7005
Sugar v1.14.6+minisat (complete)2087087? (MO) 14.9416 15.6519
Concrete DC 2009-07-14 (complete)2087084? (TO) 1800.05 1810.72
Concrete 2009-07-14 (complete)2087083? (TO) 1800.06 1808.72
pcs 0.3.2 (complete)2087081? (TO) 1800.07 1815.03
pcs-restart 0.3.2 (complete)2087082? (TO) 1800.08 1809.23
Conquer 2009-07-10 (complete)2087088? (TO) 1800.09 1807.82
Abscon 112v4 ESAC (complete)2098484? (TO) 1800.1 1806.78
Choco2.1.1 2009-06-10 (complete)2087085? (TO) 1800.12 1810.09
Abscon 112v4 AC (complete)2098483? (TO) 1800.17 1805.29
Choco2.1.1b 2009-07-16 (complete)2117153? (TO) 1800.21 1815.32
SAT4J CSP 2.1.1 (complete)2087080? (TO) 1800.39 1805.1

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
4 0 0 3 3 0 1 2 2 0 0 0 2 0 3 2 2 2 2 1 2 1 0 1 4