CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/dag-half/
normalized-half-n25-d5-e56-r7-7.xml

Jump to solvers results

General information on the benchmark

Namecsp/dag-half/
normalized-half-n25-d5-e56-r7-7.xml
MD5SUM4a2cc2f5664c2ecf671a222adbdc0b93
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark70.5703
Satisfiable
(Un)Satisfiability was proved
Number of variables25
Number of constraints56
Maximum constraint arity7
Maximum domain size5
Number of constraints which are defined in extension56
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2087067SAT 70.5703 70.9605
Conquer 2009-07-10 (complete)2087066SAT 523.756 526.052
Choco2.1.1 2009-06-10 (complete)2087063SAT 1159.82 1162.49
bpsolver 09 (complete)2087068? (problem) 168.583 170.746
Sugar v1.14.6+picosat (complete)2087064? (MO) 13.8858 14.308
Sugar v1.14.6+minisat (complete)2087065? (MO) 13.9058 14.3485
Concrete DC 2009-07-14 (complete)2087062? (TO) 1800.02 1822.62
Concrete 2009-07-14 (complete)2087061? (TO) 1800.07 1817.22
pcs 0.3.2 (complete)2087059? (TO) 1800.11 1804.73
pcs-restart 0.3.2 (complete)2087060? (TO) 1800.12 1813.53
Abscon 112v4 ESAC (complete)2098480? (TO) 1800.13 1806.58
Choco2.1.1b 2009-07-16 (complete)2117151? (TO) 1800.15 1817.48
Abscon 112v4 AC (complete)2098479? (TO) 1800.17 1815.48
SAT4J CSP 2.1.1 (complete)2087058? (TO) 1800.4 1808.59

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
3 4 4 1 4 0 0 0 1 4 2 0 2 1 1 3 0 3 4 2 3 1 3 2 1