CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/dag-half/
normalized-half-n25-d5-e56-r7-20.xml

Jump to solvers results

General information on the benchmark

Namecsp/dag-half/
normalized-half-n25-d5-e56-r7-20.xml
MD5SUM6d5f02cccaa55c134438d9df18996966
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark304.851
Satisfiable
(Un)Satisfiability was proved
Number of variables25
Number of constraints56
Maximum constraint arity7
Maximum domain size5
Number of constraints which are defined in extension56
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2087045SAT 304.851 306.16
pcs 0.3.2 (complete)2087037SAT 1025 1028.23
bpsolver 09 (complete)2087046? (problem) 168.167 169.564
Sugar v1.14.6+picosat (complete)2087042? (MO) 13.9038 14.5934
Sugar v1.14.6+minisat (complete)2087043? (MO) 14.9807 15.3585
Conquer 2009-07-10 (complete)2087044? (TO) 1800.01 1807.23
Concrete 2009-07-14 (complete)2087039? (TO) 1800.02 1805.62
Concrete DC 2009-07-14 (complete)2087040? (TO) 1800.04 1813.93
pcs-restart 0.3.2 (complete)2087038? (TO) 1800.05 1813.03
Abscon 112v4 AC (complete)2098475? (TO) 1800.09 1801.27
Choco2.1.1b 2009-07-16 (complete)2117149? (TO) 1800.1 1817.19
Choco2.1.1 2009-06-10 (complete)2087041? (TO) 1800.12 1805.57
Abscon 112v4 ESAC (complete)2098476? (TO) 1800.18 1805.89
SAT4J CSP 2.1.1 (complete)2087036? (TO) 1800.45 1814.32

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
0 0 0 3 4 2 2 4 0 1 4 0 3 1 2 1 3 1 3 4 4 0 4 4 2