CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/dag-half/
normalized-half-n25-d5-e56-r7-15.xml

Jump to solvers results

General information on the benchmark

Namecsp/dag-half/
normalized-half-n25-d5-e56-r7-15.xml
MD5SUM713a972bba9428fb05a58365aba095c6
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark445.586
Satisfiable
(Un)Satisfiability was proved
Number of variables25
Number of constraints56
Maximum constraint arity7
Maximum domain size5
Number of constraints which are defined in extension56
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2087012SAT 445.586 449.407
SAT4J CSP 2.1.1 (complete)2087003SAT 1655.66 1663.66
bpsolver 09 (complete)2087013? (problem) 169.53 170.367
Sugar v1.14.6+picosat (complete)2087009? (MO) 14.52 14.8604
Sugar v1.14.6+minisat (complete)2087010? (MO) 14.52 14.8543
Conquer 2009-07-10 (complete)2087011? (TO) 1800.02 1807.33
Concrete DC 2009-07-14 (complete)2087007? (TO) 1800.04 1809.02
Concrete 2009-07-14 (complete)2087006? (TO) 1800.05 1814.52
Abscon 112v4 AC (complete)2098469? (TO) 1800.1 1801.36
pcs-restart 0.3.2 (complete)2087005? (TO) 1800.1 1805.53
pcs 0.3.2 (complete)2087004? (TO) 1800.13 1802.93
Abscon 112v4 ESAC (complete)2098470? (TO) 1800.14 1808.4
Choco2.1.1b 2009-07-16 (complete)2117146? (TO) 1800.15 1809.2
Choco2.1.1 2009-06-10 (complete)2087008? (TO) 1800.21 1811.93

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
0 3 2 1 3 3 4 3 4 0 3 3 4 2 1 4 3 3 4 0 4 3 3 2 1