CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/graphColoring/hos/
normalized-abb313GPIA-8.xml

Jump to solvers results

General information on the benchmark

Namecsp/graphColoring/hos/
normalized-abb313GPIA-8.xml
MD5SUM34dd6ad79d3bd8c2f3cfcc0bee35d64e
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark301.054
Satisfiable
(Un)Satisfiability was proved
Number of variables1557
Number of constraints65390
Maximum constraint arity2
Maximum domain size8
Number of constraints which are defined in extension0
Number of constraints which are defined in intension65390
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Sugar v1.14.6+minisat (complete)2085580UNSAT 301.054 302.659
Sugar v1.14.6+picosat (complete)2085579? (TO) 1800.01 1810.54
Concrete 2009-07-14 (complete)2085576? (TO) 1800.02 1809.02
Mistral 1.545 (complete)2085582? (TO) 1800.04 1808.71
Concrete DC 2009-07-14 (complete)2085577? (TO) 1800.07 1806.12
Choco2.1.1 2009-06-10 (complete)2085578? (TO) 1800.07 1812.17
bpsolver 09 (complete)2085583? (TO) 1800.1 1806.82
Abscon 112v4 AC (complete)2098209? (TO) 1800.11 1807.64
pcs 0.3.2 (complete)2085574? (TO) 1800.11 1809.14
pcs-restart 0.3.2 (complete)2085575? (TO) 1800.14 1814.94
Choco2.1.1b 2009-07-16 (complete)2117016? (TO) 1800.15 1802.1
Abscon 112v4 ESAC (complete)2098210? (TO) 1800.15 1810.18
SAT4J CSP 2.1.1 (complete)2085573? (TO) 1800.34 1800.73

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: