CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/graphColoring/sgb/
miles/normalized-miles1500-55.xml

Jump to solvers results

General information on the benchmark

Namecsp/graphColoring/sgb/
miles/normalized-miles1500-55.xml
MD5SUMbcfa8a7cc471ab5fac6c7c2d2ab0ee51
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.200968
Satisfiable
(Un)Satisfiability was proved
Number of variables128
Number of constraints5198
Maximum constraint arity2
Maximum domain size55
Number of constraints which are defined in extension0
Number of constraints which are defined in intension5198
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2085450UNSAT 0.200968 0.214127
pcs 0.3.2 (complete)2085442UNSAT 0.201968 0.214244
pcs-restart 0.3.2 (complete)2085443UNSAT 0.201969 0.208729
bpsolver 09 (complete)2085451UNSAT 1.63775 1.65511
Abscon 112v4 ESAC (complete)2098186UNSAT 2.01969 2.08919
Abscon 112v4 AC (complete)2098185UNSAT 2.08268 2.15587
Choco2.1.1 2009-06-10 (complete)2085446UNSAT 4.5983 4.67961
Choco2.1.1b 2009-07-16 (complete)2117004UNSAT 5.00024 5.0883
Concrete 2009-07-14 (complete)2085444? (TO) 1800.02 1807.72
Sugar v1.14.6+picosat (complete)2085447? (TO) 1800.04 1810.02
Concrete DC 2009-07-14 (complete)2085445? (TO) 1800.07 1810.32
Sugar v1.14.6+minisat (complete)2085448? (TO) 1800.09 1812.04
SAT4J CSP 2.1.1 (complete)2085441? (TO) 1800.42 1809.76

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: