CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/graphColoring/leighton/leighton-5/
normalized-lei450-05a-04.xml

Jump to solvers results

General information on the benchmark

Namecsp/graphColoring/leighton/leighton-5/
normalized-lei450-05a-04.xml
MD5SUM9b02652f068c21dada85a83d70028d36
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.207968
Satisfiable
(Un)Satisfiability was proved
Number of variables450
Number of constraints5714
Maximum constraint arity2
Maximum domain size4
Number of constraints which are defined in extension0
Number of constraints which are defined in intension5714
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2085208UNSAT 0.207968 0.221737
pcs-restart 0.3.2 (complete)2085201UNSAT 0.208967 0.216698
pcs 0.3.2 (complete)2085200UNSAT 0.208968 0.220278
Choco2.1.1b 2009-07-16 (complete)2116982UNSAT 1.92471 1.69746
Choco2.1.1 2009-06-10 (complete)2085204UNSAT 2.06969 2.11239
Abscon 112v4 ESAC (complete)2098142UNSAT 2.10068 2.14354
Abscon 112v4 AC (complete)2098141UNSAT 2.12468 1.86211
Sugar v1.14.6+minisat (complete)2085206UNSAT 2.34564 2.49174
Sugar v1.14.6+picosat (complete)2085205UNSAT 2.69259 2.84683
bpsolver 09 (complete)2085209UNSAT 5.2512 5.2803
Concrete 2009-07-14 (complete)2085202UNSAT 5.28819 5.37366
SAT4J CSP 2.1.1 (complete)2085199UNSAT 5.68114 5.69941
Concrete DC 2009-07-14 (complete)2085203UNSAT 8.48871 8.62936

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: