CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/graphColoring/leighton/leighton-5/
normalized-lei450-05c-04.xml

Jump to solvers results

General information on the benchmark

Namecsp/graphColoring/leighton/leighton-5/
normalized-lei450-05c-04.xml
MD5SUM51e3a409d29f8ba8e006b0765e6c3201
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.346946
Satisfiable
(Un)Satisfiability was proved
Number of variables450
Number of constraints9803
Maximum constraint arity2
Maximum domain size4
Number of constraints which are defined in extension0
Number of constraints which are defined in intension9803
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
pcs-restart 0.3.2 (complete)2085190UNSAT 0.346946 0.354262
pcs 0.3.2 (complete)2085189UNSAT 0.348946 0.361308
Mistral 1.545 (complete)2085197UNSAT 0.377942 0.379863
Choco2.1.1b 2009-07-16 (complete)2116981UNSAT 2.75458 2.83365
Choco2.1.1 2009-06-10 (complete)2085193UNSAT 2.78557 2.83979
Abscon 112v4 ESAC (complete)2098140UNSAT 2.82657 2.86954
Abscon 112v4 AC (complete)2098139UNSAT 2.86356 2.79679
Sugar v1.14.6+minisat (complete)2085195UNSAT 2.98255 3.13556
Sugar v1.14.6+picosat (complete)2085194UNSAT 3.37949 3.50152
SAT4J CSP 2.1.1 (complete)2085188UNSAT 6.12307 6.15479
Concrete 2009-07-14 (complete)2085191UNSAT 9.97248 10.1163
Concrete DC 2009-07-14 (complete)2085192UNSAT 17.2454 17.3804
bpsolver 09 (complete)2085198UNSAT 19.938 20.0949

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: