CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/graphColoring/leighton/leighton-15/
normalized-lei450-15c-05.xml

Jump to solvers results

General information on the benchmark

Namecsp/graphColoring/leighton/leighton-15/
normalized-lei450-15c-05.xml
MD5SUM84fc63cc2a33533bd896380fe6d2d519
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.610906
Satisfiable
(Un)Satisfiability was proved
Number of variables450
Number of constraints16680
Maximum constraint arity2
Maximum domain size5
Number of constraints which are defined in extension0
Number of constraints which are defined in intension16680
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
pcs 0.3.2 (complete)2085156UNSAT 0.610906 0.624166
pcs-restart 0.3.2 (complete)2085157UNSAT 0.612906 0.626482
Mistral 1.545 (complete)2085164UNSAT 0.630903 0.63487
Sugar v1.14.6+minisat (complete)2085162UNSAT 3.9744 4.20484
Choco2.1.1 2009-06-10 (complete)2085160UNSAT 4.28635 4.35905
Abscon 112v4 ESAC (complete)2098134UNSAT 4.29335 4.39557
Choco2.1.1b 2009-07-16 (complete)2116978UNSAT 4.30335 4.37077
Abscon 112v4 AC (complete)2098133UNSAT 4.36833 4.45148
Sugar v1.14.6+picosat (complete)2085161UNSAT 5.84211 6.00057
SAT4J CSP 2.1.1 (complete)2085155UNSAT 7.69983 7.70979
bpsolver 09 (complete)2085165UNSAT 18.5002 18.6843
Concrete 2009-07-14 (complete)2085158UNSAT 31.9871 32.0426
Concrete DC 2009-07-14 (complete)2085159UNSAT 49.9454 50.5403

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: