CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/graphColoring/leighton/leighton-15/
normalized-lei450-15c-08.xml

Jump to solvers results

General information on the benchmark

Namecsp/graphColoring/leighton/leighton-15/
normalized-lei450-15c-08.xml
MD5SUM1581c0b2d6c52891a3cea0ca963639cd
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.558914
Satisfiable
(Un)Satisfiability was proved
Number of variables450
Number of constraints16680
Maximum constraint arity2
Maximum domain size8
Number of constraints which are defined in extension0
Number of constraints which are defined in intension16680
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
pcs 0.3.2 (complete)2085090UNSAT 0.558914 0.563139
pcs-restart 0.3.2 (complete)2085091UNSAT 0.560913 0.562647
Mistral 1.545 (complete)2085098UNSAT 0.632902 0.636811
Choco2.1.1b 2009-07-16 (complete)2116972UNSAT 3.90541 3.92098
Abscon 112v4 AC (complete)2098121UNSAT 4.03039 4.08544
Abscon 112v4 ESAC (complete)2098122UNSAT 4.13437 4.21521
Choco2.1.1 2009-06-10 (complete)2085094UNSAT 4.39733 4.47765
Sugar v1.14.6+minisat (complete)2085096UNSAT 4.90625 5.07995
Sugar v1.14.6+picosat (complete)2085095UNSAT 7.68483 7.86273
bpsolver 09 (complete)2085099UNSAT 18.3892 18.5582
SAT4J CSP 2.1.1 (complete)2085089UNSAT 33.2429 33.5352
Concrete 2009-07-14 (complete)2085092UNSAT 847.78 851.934
Concrete DC 2009-07-14 (complete)2085093UNSAT 1028.56 1038.36

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: