CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/graphColoring/leighton/leighton-25/
normalized-lei450-25a-10.xml

Jump to solvers results

General information on the benchmark

Namecsp/graphColoring/leighton/leighton-25/
normalized-lei450-25a-10.xml
MD5SUMdf083528def98766040de5137ae9b631
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.292954
Satisfiable
(Un)Satisfiability was proved
Number of variables450
Number of constraints8260
Maximum constraint arity2
Maximum domain size10
Number of constraints which are defined in extension0
Number of constraints which are defined in intension8260
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
pcs 0.3.2 (complete)2085035UNSAT 0.292954 0.302659
pcs-restart 0.3.2 (complete)2085036UNSAT 0.295954 0.308625
Mistral 1.545 (complete)2085043UNSAT 0.303953 0.358383
Choco2.1.1b 2009-07-16 (complete)2116967UNSAT 2.14267 2.19246
Choco2.1.1 2009-06-10 (complete)2085039UNSAT 2.16767 2.20071
Abscon 112v4 ESAC (complete)2098112UNSAT 2.6026 2.66763
Abscon 112v4 AC (complete)2098111UNSAT 2.70459 2.74399
bpsolver 09 (complete)2085044UNSAT 3.35349 3.37003
Sugar v1.14.6+minisat (complete)2085041UNSAT 5.51316 5.64246
Sugar v1.14.6+picosat (complete)2085040UNSAT 13.6959 13.9789
Concrete 2009-07-14 (complete)2085037? (TO) 1800.06 1811.72
Concrete DC 2009-07-14 (complete)2085038? (TO) 1800.09 1801.42
SAT4J CSP 2.1.1 (complete)2085034? (TO) 1800.88 1813.58

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: