CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/graphColoring/leighton/leighton-25/
normalized-lei450-25d-23.xml

Jump to solvers results

General information on the benchmark

Namecsp/graphColoring/leighton/leighton-25/
normalized-lei450-25d-23.xml
MD5SUMede0d66de0ce550243893916034293f6
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.618905
Satisfiable
(Un)Satisfiability was proved
Number of variables450
Number of constraints17425
Maximum constraint arity2
Maximum domain size23
Number of constraints which are defined in extension0
Number of constraints which are defined in intension17425
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
pcs-restart 0.3.2 (complete)2085025UNSAT 0.618905 0.629918
pcs 0.3.2 (complete)2085024UNSAT 0.619905 0.629507
Mistral 1.545 (complete)2085032UNSAT 0.667897 0.727213
Abscon 112v4 ESAC (complete)2098110UNSAT 4.43433 4.49458
Abscon 112v4 AC (complete)2098109UNSAT 4.50431 4.609
Choco2.1.1 2009-06-10 (complete)2085028UNSAT 4.5973 4.84995
Choco2.1.1b 2009-07-16 (complete)2116966UNSAT 4.85026 4.9069
bpsolver 09 (complete)2085033UNSAT 12.1791 12.184
Sugar v1.14.6+picosat (complete)2085029? (TO) 1800.01 1809.13
Concrete 2009-07-14 (complete)2085026? (TO) 1800.01 1808.82
Sugar v1.14.6+minisat (complete)2085030? (TO) 1800.02 1801.54
Concrete DC 2009-07-14 (complete)2085027? (TO) 1800.07 1809.22
SAT4J CSP 2.1.1 (complete)2085023? (TO) 1800.32 1802

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: