CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/graphColoring/leighton/leighton-25/
normalized-lei450-25d-15.xml

Jump to solvers results

General information on the benchmark

Namecsp/graphColoring/leighton/leighton-25/
normalized-lei450-25d-15.xml
MD5SUM917981834808c159ee00e186d5eaaf39
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.620905
Satisfiable
(Un)Satisfiability was proved
Number of variables450
Number of constraints17425
Maximum constraint arity2
Maximum domain size15
Number of constraints which are defined in extension0
Number of constraints which are defined in intension17425
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
pcs-restart 0.3.2 (complete)2085014UNSAT 0.620905 0.631974
pcs 0.3.2 (complete)2085013UNSAT 0.621905 0.635322
Mistral 1.545 (complete)2085021UNSAT 0.655899 0.664406
Abscon 112v4 ESAC (complete)2098108UNSAT 4.18236 4.23475
Abscon 112v4 AC (complete)2098107UNSAT 4.20536 4.48539
Choco2.1.1 2009-06-10 (complete)2085017UNSAT 4.80027 4.83183
Choco2.1.1b 2009-07-16 (complete)2116965UNSAT 4.80427 4.86289
bpsolver 09 (complete)2085022UNSAT 12.3581 12.4064
Sugar v1.14.6+minisat (complete)2085019? (TO) 1800.03 1817.24
Concrete 2009-07-14 (complete)2085015? (TO) 1800.05 1809.62
Sugar v1.14.6+picosat (complete)2085018? (TO) 1800.1 1813.63
Concrete DC 2009-07-14 (complete)2085016? (TO) 1800.1 1804.52
SAT4J CSP 2.1.1 (complete)2085012? (TO) 1800.27 1807.55

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: