CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/graphColoring/leighton/leighton-25/
normalized-lei450-25b-10.xml

Jump to solvers results

General information on the benchmark

Namecsp/graphColoring/leighton/leighton-25/
normalized-lei450-25b-10.xml
MD5SUM749c86e81d6a708e64be3466173af727
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.293954
Satisfiable
(Un)Satisfiability was proved
Number of variables450
Number of constraints8263
Maximum constraint arity2
Maximum domain size10
Number of constraints which are defined in extension0
Number of constraints which are defined in intension8263
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
pcs 0.3.2 (complete)2085002UNSAT 0.293954 0.29519
pcs-restart 0.3.2 (complete)2085003UNSAT 0.293954 0.300758
Mistral 1.545 (complete)2085010UNSAT 0.316951 0.323568
Choco2.1.1b 2009-07-16 (complete)2116964UNSAT 2.22366 2.27835
Choco2.1.1 2009-06-10 (complete)2085006UNSAT 2.43663 2.48775
Abscon 112v4 AC (complete)2098105UNSAT 2.55761 2.6125
Abscon 112v4 ESAC (complete)2098106UNSAT 2.72158 2.78214
bpsolver 09 (complete)2085011UNSAT 3.40448 3.44251
Sugar v1.14.6+minisat (complete)2085008UNSAT 8.20275 8.43583
Sugar v1.14.6+picosat (complete)2085007UNSAT 17.0444 17.3351
Concrete DC 2009-07-14 (complete)2085005? (TO) 1800.03 1804.82
Concrete 2009-07-14 (complete)2085004? (TO) 1800.08 1815.82
SAT4J CSP 2.1.1 (complete)2085001? (TO) 1800.66 1809.65

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: