CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/graphColoring/leighton/leighton-25/
normalized-lei450-25a-20.xml

Jump to solvers results

General information on the benchmark

Namecsp/graphColoring/leighton/leighton-25/
normalized-lei450-25a-20.xml
MD5SUM9fd5dc5134c8b962932ab2640e6eee46
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.295954
Satisfiable
(Un)Satisfiability was proved
Number of variables450
Number of constraints8260
Maximum constraint arity2
Maximum domain size20
Number of constraints which are defined in extension0
Number of constraints which are defined in intension8260
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
pcs 0.3.2 (complete)2084969UNSAT 0.295954 0.306173
pcs-restart 0.3.2 (complete)2084970UNSAT 0.295954 0.300517
Mistral 1.545 (complete)2084977UNSAT 0.297954 0.300976
Choco2.1.1b 2009-07-16 (complete)2116961UNSAT 2.26665 2.32412
Choco2.1.1 2009-06-10 (complete)2084973UNSAT 2.51162 2.53703
Abscon 112v4 AC (complete)2098099UNSAT 2.72458 2.78243
Abscon 112v4 ESAC (complete)2098100UNSAT 2.77758 2.84202
bpsolver 09 (complete)2084978UNSAT 3.63645 3.67331
Sugar v1.14.6+minisat (complete)2084975? (TO) 1800.07 1801.63
Concrete DC 2009-07-14 (complete)2084972? (TO) 1800.08 1814.82
Concrete 2009-07-14 (complete)2084971? (TO) 1800.1 1807.82
Sugar v1.14.6+picosat (complete)2084974? (TO) 1800.12 1807.63
SAT4J CSP 2.1.1 (complete)2084968? (TO) 1800.46 1807.8

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: