CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/graphColoring/register/zeroin/
normalized-zeroin-i-1-20.xml

Jump to solvers results

General information on the benchmark

Namecsp/graphColoring/register/zeroin/
normalized-zeroin-i-1-20.xml
MD5SUM5a658ecce9751df456415fcf4c35a839
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.144977
Satisfiable
(Un)Satisfiability was proved
Number of variables211
Number of constraints4100
Maximum constraint arity2
Maximum domain size20
Number of constraints which are defined in extension0
Number of constraints which are defined in intension4100
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
pcs-restart 0.3.2 (complete)2084750UNSAT 0.144977 0.144115
pcs 0.3.2 (complete)2084749UNSAT 0.144977 0.147463
Mistral 1.545 (complete)2084757UNSAT 0.149976 0.194317
Abscon 112v4 ESAC (complete)2098060UNSAT 2.10768 2.14414
Abscon 112v4 AC (complete)2098059UNSAT 2.19267 2.25394
bpsolver 09 (complete)2084758UNSAT 2.39963 2.43305
Choco2.1.1 2009-06-10 (complete)2084753UNSAT 2.50362 2.56833
Choco2.1.1b 2009-07-16 (complete)2116941UNSAT 2.87556 2.93671
Concrete 2009-07-14 (complete)2084751? (TO) 1800.02 1816.62
Sugar v1.14.6+minisat (complete)2084755? (TO) 1800.07 1805.72
Concrete DC 2009-07-14 (complete)2084752? (TO) 1800.07 1804.92
Sugar v1.14.6+picosat (complete)2084754? (TO) 1800.09 1808.12
SAT4J CSP 2.1.1 (complete)2084748? (TO) 1800.37 1801.19

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: