CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/rlfapScens11/
normalized-scen11-f11.xml

Jump to solvers results

General information on the benchmark

Namecsp/rlfapScens11/
normalized-scen11-f11.xml
MD5SUM1cce601df2c9d21c5cc651d6398044e6
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark0.655899
Satisfiable
(Un)Satisfiability was proved
Number of variables680
Number of constraints4103
Maximum constraint arity2
Maximum domain size33
Number of constraints which are defined in extension0
Number of constraints which are defined in intension4103
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2084328UNSAT 0.655899 0.708241
Abscon 112v4 ESAC (complete)2097982UNSAT 2.49762 2.51585
Abscon 112v4 AC (complete)2097981UNSAT 2.50462 2.57145
Choco2.1.1 2009-06-10 (complete)2084324UNSAT 4.19036 4.25701
Choco2.1.1b 2009-07-16 (complete)2116902UNSAT 4.40433 4.4624
Concrete 2009-07-14 (complete)2084322UNSAT 4.86126 4.90108
Sugar v1.14.6+minisat (complete)2084326UNSAT 7.50186 7.71898
Sugar v1.14.6+picosat (complete)2084325UNSAT 9.73052 9.81462
SAT4J CSP 2.1.1 (complete)2084319UNSAT 14.2808 14.4145
pcs-restart 0.3.2 (complete)2084321UNSAT 19.1071 19.2719
pcs 0.3.2 (complete)2084320UNSAT 19.3611 19.4526
Concrete DC 2009-07-14 (complete)2084323UNSAT 133.789 135.131
bpsolver 09 (complete)2084329? (TO) 1800.02 1816.61

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: