CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/fapp/fapp28/
normalized-fapp28-2800-2.xml

Jump to solvers results

General information on the benchmark

Namecsp/fapp/fapp28/
normalized-fapp28-2800-2.xml
MD5SUM1feff749558ae4da23047eced7bab2b1
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark29.1986
Satisfiable
(Un)Satisfiability was proved
Number of variables2800
Number of constraints22569
Maximum constraint arity2
Maximum domain size998
Number of constraints which are defined in extension0
Number of constraints which are defined in intension22569
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Abscon 112v4 AC (complete)2097849UNSAT 29.1986 29.3953
Abscon 112v4 ESAC (complete)2097850UNSAT 29.5255 29.649
Concrete DC 2009-07-14 (complete)2083597UNSAT 268.317 268.476
Choco2.1.1b 2009-07-16 (complete)2116836UNSAT 268.324 268.515
Concrete 2009-07-14 (complete)2083596UNSAT 301.41 304.296
Choco2.1.1 2009-06-10 (complete)2083598UNSAT 331.253 333.266
SAT4J CSP 2.1.1 (complete)2083593? 0.78688 1.16777
Sugar v1.14.6+picosat (complete)2083599? 1036.12 1051.37
Sugar v1.14.6+minisat (complete)2083600? 1062.84 1079.18
bpsolver 09 (complete)2083603? (exit code) 11.4083 11.5052
Mistral 1.545 (complete)2083602? (TO) 1800.04 1803.72
pcs-restart 0.3.2 (complete)2083595? (TO) 1800.12 1811.84
pcs 0.3.2 (complete)2083594? (TO) 1800.19 1802.39

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: