CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/rand-8-20-5/
normalized-rand-8-20-5-18-800-6_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/rand-8-20-5/
normalized-rand-8-20-5-18-800-6_ext.xml
MD5SUM3888b994eade183d2e4ca8097fc27fc8
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark15.2527
Satisfiable
(Un)Satisfiability was proved
Number of variables20
Number of constraints18
Maximum constraint arity8
Maximum domain size5
Number of constraints which are defined in extension18
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Choco2.1.1 2009-06-10 (complete)2082465SAT 15.2527 15.3039
Mistral 1.545 (complete)2082469SAT 22.7145 22.7948
Conquer 2009-07-10 (complete)2082468SAT 61.0037 61.5183
Abscon 112v4 ESAC (complete)2097644SAT 145.968 147.434
Abscon 112v4 AC (complete)2097643SAT 173.777 175.166
Choco2.1.1b 2009-07-16 (complete)2116733SAT 245.664 246.956
pcs 0.3.2 (complete)2082461SAT 812.989 813.407
Concrete 2009-07-14 (complete)2082463SAT 1001.22 1006.08
Concrete DC 2009-07-14 (complete)2082464SAT 1119.24 1129.47
pcs-restart 0.3.2 (complete)2082462SAT 1296.25 1297.01
SAT4J CSP 2.1.1 (complete)2082460? 105.7 105.224
bpsolver 09 (complete)2082470? (problem) 125.376 126.511
Sugar v1.14.6+picosat (complete)2082466? (MO) 12.869 13.2884
Sugar v1.14.6+minisat (complete)2082467? (MO) 13.27 13.5786

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
3 2 3 3 0 2 1 4 4 4 2 1 3 3 0 2 1 4 3 4