CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/rand-8-20-5/
normalized-rand-8-20-5-18-800-1_ext.xml

Jump to solvers results

General information on the benchmark

Namecsp/rand-8-20-5/
normalized-rand-8-20-5-18-800-1_ext.xml
MD5SUM777fc5a1408e3970fe4cdc5b66e8ea16
Bench CategoryN-ARY-EXT (n-ary constraints in extension)
Best result obtained on this benchmarkSAT
Best CPU time to get the best result obtained on this benchmark9.2066
Satisfiable
(Un)Satisfiability was proved
Number of variables20
Number of constraints18
Maximum constraint arity8
Maximum domain size5
Number of constraints which are defined in extension18
Number of constraints which are defined in intension0
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Choco2.1.1b 2009-07-16 (complete)2116728SAT 9.2066 9.31592
Mistral 1.545 (complete)2082414SAT 25.4321 25.4481
Choco2.1.1 2009-06-10 (complete)2082410SAT 69.7074 70.4234
Conquer 2009-07-10 (complete)2082413SAT 72.405 73.0372
Abscon 112v4 AC (complete)2097633SAT 236.056 238.271
Abscon 112v4 ESAC (complete)2097634SAT 248.645 249.887
Concrete 2009-07-14 (complete)2082408SAT 376.556 376.717
pcs 0.3.2 (complete)2082406SAT 385.884 389.462
Concrete DC 2009-07-14 (complete)2082409SAT 446.927 447.181
pcs-restart 0.3.2 (complete)2082407SAT 847.998 853.215
SAT4J CSP 2.1.1 (complete)2082405? 92.047 91.6634
bpsolver 09 (complete)2082415? (problem) 125.191 126.312
Sugar v1.14.6+picosat (complete)2082411? (MO) 13.22 14.1164
Sugar v1.14.6+minisat (complete)2082412? (MO) 15.04 21.8421

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found:
2 1 1 3 1 4 0 4 3 3 4 2 4 4 0 4 1 2 3 1