CSP 2009 Competition: solvers results per benchmarks

Result page for benchmark
csp/super-queens/
normalized-super-queens-9.xml

Jump to solvers results

General information on the benchmark

Namecsp/super-queens/
normalized-super-queens-9.xml
MD5SUM18b7059da0498c17376d1b6f8b9dd1af
Bench Category2-ARY-INT (binary constraints in intension)
Best result obtained on this benchmarkUNSAT
Best CPU time to get the best result obtained on this benchmark2.89156
Satisfiable
(Un)Satisfiability was proved
Number of variables400
Number of constraints59900
Maximum constraint arity2
Maximum domain size200
Number of constraints which are defined in extension0
Number of constraints which are defined in intension59900
Global constraints used (with number of constraints)

Results of the different solvers on this benchmark

Solver NameTraceIDAnswerCPU timeWall clock time
Mistral 1.545 (complete)2082095UNSAT 2.89156 3.18372
pcs-restart 0.3.2 (complete)2082088UNSAT 6.85296 6.93394
pcs 0.3.2 (complete)2082087UNSAT 6.95994 7.04931
Abscon 112v4 ESAC (complete)2097576UNSAT 18.0103 18.2031
Abscon 112v4 AC (complete)2097575UNSAT 18.0633 20.8084
bpsolver 09 (complete)2082096UNSAT 1798.9 1806.69
SAT4J CSP 2.1.1 (complete)2082086? 204.671 200.437
Sugar v1.14.6+minisat (complete)2082093? (MO) 137.792 142.156
Sugar v1.14.6+picosat (complete)2082092? (MO) 335.912 341.648
Concrete DC 2009-07-14 (complete)2082090? (TO) 1800.03 1808.02
Concrete 2009-07-14 (complete)2082089? (TO) 1800.08 1818.52
Choco2.1.1 2009-06-10 (complete)2082091? (TO) 1800.13 1808.21
Choco2.1.1b 2009-07-16 (complete)2116699? (TO) 1800.22 1801.85

Additionnal information

This section presents information obtained from the best job displayed in the list (i.e. solvers whose names are not hidden).

Solution found: